Back to search results
LEVIATHAN G.M. NO.3
5110 COLAC-BALLARAT ROAD CAMBRIAN HILL, GOLDEN PLAINS SHIRE
LEVIATHAN G.M. NO.3
5110 COLAC-BALLARAT ROAD CAMBRIAN HILL, GOLDEN PLAINS SHIRE
All information on this page is maintained by Heritage Victoria.
Click below for their website and contact details.
Victorian Heritage Inventory
-
Add to tour
You must log in to do that.
-
Share
-
Shortlist place
You must log in to do that.
- Download report
On this page:
Statement of Significance
This record has minimal details. Please look to the right-hand-side bar for any further details about this record.
Show more
Show less
-
-
LEVIATHAN G.M. NO.3 - History
Contextual History:History of Place:
Heritage Inventory History of Site:
LEVIATHAN GOLD MINING COMPANY
10.1858: company registered
1858: registered with 32 shareholders on the Napoleon Lead. Because the direction of the lead was unknown the company amalgamated with the Junction Co. to give it 6200 feet of the Black Lead, 3520 feet of the Napoleons Lead and 1500 feet of the Franklin Lead. The company had a capital of £12,800 in 64 shares of £200 each. The company had to abandon its original machinery and purchase more powerful pumps to control the water as the gutter was approached. This became common practice for mines along this lead. The company eventually sank 3 shafts the last almost a mile north the first. For years over 100 men were employed.
08.1860: driven 280 feet but no sign of a break through.
02.1860: at present yielding good wages.
04.1861: have driven north for 600 feet without striking the gutter.
07.1861: have driven north 680 feet; think that the deep round is nearby.
12.1861: a bore in the back of the drive struck wash-dirt and the shareholders expect to strike the gutter soon.
07.1862: 12 inch by 36 inch steam engine for pumping and winding operating at 12 strokes per minute; boiler, 15 feet 6 inches by 5 feet 6 inches
7.5 inch pumps, plunger to 230 feet, drawlift a further 104 feet; 4 x 5 foot strokes per minute; water getting heavier
machinery purchased from the Defiance Company, Sebastopol; consisting of:22 inch by 44 inch steam engine; boiler, 26 feet by 6 feet 6 inches; 13.5 inch pumps, plunger and drawlift; To retain existing steam engine for winding purposes; poppet heads 60 feet high
08.1862: fixing 13.5 inch pumps
09.1862: large pumps fixed in the shaft; first plunger down 230 feet
03.1864: started work again on Napoleon Lead.
12.1864: still driving, should find the deep ground shortly.
03.1865: pushing their main drive toward the Franklyn Lead - the main gutter; also started a drive for the Napoleon.
12.09.1865: contract let for winding gear, double cages, 50 iron trucks, cast iron puddling machine; constructing double tramway
19.09.1865; washing discontinued pending erection of machinery
09.1865: only company working the Napoleon Lead, have struck the deep ground and are now preparing machinery to work on a large scale.
12.1865: driving for the Napoleon Lead and working the Franklyn or main gutter with considerable success.
Mid 1860's: the Bonshaw Freehold, the Buninyong Freehold, and the Leviathan were huge companies and were financed by speculators and capitalists mostly from Ballarat; these mines employed experienced Welsh and Cornish miners who were prepared to work for wages.
03.1866: ground in the main gutter has improved and they are also working for the gutter in the higher portions of their claim.
06.1866: yields are more than paying expenses; horses introduced for underground working and with other improvements dividends will increase.
10.07.1866: horses underground, working at the gutter
31.07.1866: buddle erected for £108; building for buddle and No. 1 puddling machine to cost £33; trucks arranged for haulage by horse; several horses sent down
09.1866: obtaining payable gold from the main gutter; cost of driving for the Napoleon gutter are high.
12.1866: yielding 50 ounces per day from the main lead; still driving for the Napoleon gutter.
03.1867: gold from the main gutter is just paying expenses; still driving for the Napoleon gutter.
26.06.1867: main shaft, 6 feet 2 inches by 3 feet, down 334 feet
22.625 inch by 42 inch steam engine for puddling and pumping; 12.25 inch by 36 inch steam engine for winding
3 boilers: 2 x 22 feet by 6 feet 6 inches; 1 x 15 feet 6 inches 6 inches
13.5 inch pumps, plunger and drawlift; 7 x 5 foot strokes per minute; 3 iron puddling machines; buddle; flat Manilla ropes
Pumps and one of the steam engines belonged to the Defiance Company, Sebastopol
06.1867: struck the Napoleon gutter at last.
26.07.1867: 24 new trucks purchased, additional horse sent below
180 stoppages for the quarter: 96 from accidental firing of portion of the incline airway; 24 from breakage of pump rods; 60 from breaking of the flywheel shaft of the pumping engine
09.1867: barely paying until the later part of the quarter.
12.1867: yield of 1464 ounces.
03.1868; yield of 540 ounces.
25.04.1868: sinking new shaft, 9 feet by 6 feet, down 64 feet; new horse road laid in drive and up to faces; water making at 7,500 gallons per hour
boilers, pumps, puddling machines and winding machinery in a thorough state of efficiency
06.1868: yield of 703 ounces.
09.1868: yield of 1280 ounces 11 dwts.
11.1868: machinery in good repair
12.1868: yield of 1101 ounces.
03.1869: yield of 1844 ounces and 5 dwt.
06.1869: yield of 2226 ounces and 10 dwt.
09.1869: yield of 1051 ounces 4 dwt.
11.1869: machinery and pumps in good repair; still pumping 16,500 gallons of water per hour
12.1869: good yield but expenses were high, employing 329 men and boys; yield of 2690 ounces and 12 dwt.
03.1870: this company is now working out of the No. 5 or Buninyong Division and reports are for that division.
01.1870: No. 2 shaft: erecting machinery
04.1870: a further 3 months' extension given by the Scottish and Cornish Company to purchased their plant
03.1874: working a rich tributary toward Kitty’s Ranges.
06.1874: yield of 615 ounces 8 dwt from the No. 1 shaft at Napoleon’s Lead.
01.1866 to 12.1874: recorded production of 58,349 ozs 5 dwt (or 1814.907 kg).Heritage Inventory Description
LEVIATHAN G.M. NO.3 - Heritage Inventory Description
At the Leviathan GM No.3 the area of disturbance is 150m by 80m. Within this area is the remains of a mullock heap 30m by 25m by 3.5m high. The balance of the area is scattered with gravel and mullock.
Heritage Inventory Signficance: Local
-
-
-
-
-
FORMER BLACK LEAD UNITING CHURCH AND HALLVictorian Heritage Register H2173
-
SCOTTISH AND CORNISH G.M. CO. NO.1Victorian Heritage Inventory
-
FORMER BLACK LEAD UNITING CHURCH AND HALLGolden Plains Shire H2173
-
-